Solvei8FACTORY OS
FIELD RECORD · 140+ FACTORIES · 8 COUNTRIES Request a demo

A MOTION STUDY OF THE MODERN APPAREL FACTORY · CONDUCTED LIVE

Your systems report the factory. Factory OS controls it.

The real-time control layer for planning, production, quality, maintenance and operator tracking — replacing siloed point tools, running above the ERP and shopfloor systems you already trust, and forming the foundation your factory’s AI runs on.

OBSERVED IN THE FIELD, THIS MONTH
140+factories digitised
27Mgarments tracked / month
6,000+floor users daily
3,750+production lines live
PLATE 01 — CHRONOCYCLEGRAPH ORDER OB-4471 · 42,000 PCS · EXPOSURE: DAY 0 → DAY 27
PREP CUTTING EMBELL. SEWING WASH · FINISH PACK DAY 0 D3 D5 D7 D12 D21 D23 D25 D27 SCALE: ONE DIV = ONE DAY SOLVEI8 · FIELD RECORD PO CONFIRMED CUT START EMB. START PSD DEVIATION — LINE 14 BALANCE · 09:41 REBALANCED · CORRECTED 09:45 (4 MIN) PED FINISH PED HELD · DAY 27

Plate 01. Chronocyclegraph of order OB-4471 — 42,000 pieces traced from PO confirmation to packing. A balance deviation on Day 12 was detected and corrected in 4 minutes; delivery held at Day 27. Across live deployments, event-to-action time has fallen from 38 minutes to 4. Illustrative trace; metrics from live deployments.


I.

The condition: reports arrive after the damage

MES, planning software and QMS digitize work — nobody is running the outcomes. Most enterprise stacks are stitched from siloed systems built to record what already happened. By the time the report reaches the C-suite, the situation has moved on and the shipment is already at risk. The study opens with three findings from the field.

FINDING 01 · OBSERVED ACROSS SHIFTS

The report arrives too late.

End-of-day rollups describe a situation that no longer exists. A morning DHU breach sits inside a mid-day Excel review; course correction lands next shift, after the damage. The same breach, observed live, closes in the hour.

FIG. 01 — ONE DHU BREACH, TWO OUTCOMES · DEFECTS PER HUNDRED UNITS OVER ONE SHIFT
5% 4% 3% 2% 1% T+0 T+1H T+2H T+4H T+8H UNOBSERVED — DHU 4.5% ALL DAY · FIX NEXT SHIFT T+0 — DHU BREACH · 4.5% · DETECTED AT THE OPERATION T+11 MIN — CAP APPROVED T+1 HR — DHU 2.75% OBSERVED WITH FACTORY OS — CORRECTED INSIDE THE HOUR
LOG A — THE BREACH, OBSERVED LIVE
T+0DHU breach detected at the operation
T+2 MINAlert raised with context, to the right person
T+5 MINSupervisor escalates to the quality manager
T+11 MINCorrective action plan approved
T+30 MINDHU down to 3.5%
T+1 HRDHU down to 2.75% — shift saved
LOG B — THE SAME BREACH, LEFT TO THE REPORT
T+4 HRSMid-day Excel review catches the morning breach
T+5 HRSQuality manager triggered — no root cause attached
T+8 HRSNext shift begins course correction — after the damage
DHU 4.5% ALL DAY · THE DAY IS ALREADY LOST

FINDING 02 · THE ESCALATION GAP

Issues escalate before anyone acts.

A 9 a.m. machine fault waits half a day to reach the right desk. The industry-standard delay from an incident on the floor to action with the right stakeholder is measured in hours; the study measures it in minutes.

5.5 hrs

INDUSTRY — INCIDENT TO THE RIGHT STAKEHOLDER

4 min

FACTORY OS — EVENT TO ACTION, OBSERVED

FINDING 03 · THE DISCONNECT

Planning and execution are disconnected.

A 4-day fabric delay, invisible to a sewing-only plan, cascades downstream untouched — and surfaces as 4 lost sewing days after the cutting room has already absorbed the blame. Nothing re-planned, because nothing upstream was ever in the plan.

FIG. 02 — THE CASCADE OF AN UNPLANNED DELAY · ORDER TIMELINE, DAYS 1–25
FABRIC CUTTING EMBELL. SEWING 4 LOST SEWING DAYS — D9 TO D13 +4D — MILL DELAY, FLAGGED TO NO ONE’S PLAN D1 D5 D10 D15 D20 D25 · SHIP PLANNED ACTUAL

Figs. 01–02. The condition the study corrects: reporting describes the day after it is lost. Illustrative traces; timings and rates from live deployments.


II.

The trace splits into five processes

Competing planning and tracking tools cover sewing only. But an order does not live in sewing — it lives in five processes, and a deviation in any one of them can take the delivery date down. Factory OS holds all five in one connected plan that auto-adjusts when the floor changes.

FIG. 03 — THE SPLIT OF THE TRACE INTO PROCESS LANES

PROC. 01LANE ENTERS D3

Cutting

A cut order is not fabric on a table: it is cut-kit readiness against the production start date. Output is captured at source and reconciled to plan, so a short kit is visible days before it starves a sewing line.

READS — CUT OUTPUT · CUT-KIT READINESS · PSD RISK
INSTR. — PLANI8 · TRACKI8

PROC. 02LANE ENTERS D5

Embellishment & Embroidery

The classic blind spot, often outside the building entirely. Factory OS plans embellishment inside the same connected plan and tracks work-in-progress age and return dates, so a late panel surfaces as a planning alert, not a discovery at line-loading.

READS — WIP AGE · RETURN DATE VS PLAN
INSTR. — PLANI8 · TRACKI8

PROC. 03LANE ENTERS D7 · PSD

Sewing

Per-operation signal from every line and style, cross-referenced to plan. Operator SMV achievement, line balance and output against target; deviations reach the right person within minutes, with a corrective path attached. This is where Plate 01’s flare was caught.

READS — OUTPUT VS TARGET · LINE BALANCE · SMV ACHIEVEMENT
INSTR. — TRACKI8 · SKILLI8 · MAINTAINI8

PROC. 04LANE ENTERS D21 · PED

Washing

Wash windows are planned against the production end date, and throughput is watched against them, because a wash delay discovered on Day 25 has nowhere left to hide.

READS — WASH WINDOW VS PED · THROUGHPUT
INSTR. — PLANI8 · TRACKI8

PROC. 05LANE CLOSES D27

Finishing

Right-first-time at the end of the line, finishing-to-pack flow, and the on-time-launch figure the whole study exists to protect. The five lanes recombine here — at delivery.

READS — RFT · PACK RATE · OTL
INSTR. — TRACKI8 · MAINTAINI8


III.

Four instruments observe the study

Each module is a measuring instrument trained on one dimension of the factory — and each stands alone as a product. Working together, they give the factory operational self-awareness: cross-process risk detected, decisions triggered, and something learned from every production cycle.

INSTRUMENT 01 · MODULE

Plani8

Planning Control

The only production plan that covers all five processes — and re-plans in minutes, not days, when the floor changes.

Legacy planning tools handle sewing, maybe embroidery, on a replanning cycle measured in days, so capacity conflicts are discovered in production. Plani8 maps cutting, embellishment, embroidery, washing and sewing simultaneously, detects cross-process conflicts before they cascade, and corrects the plan while the order is still saveable.

READS — CAPACITY VS LOAD, ALL PROCESSES · CONFLICTS BEFORE PRODUCTION
SYNC — LIVE, WITH ERP AND PLANNING SOFTWARE

CUT EMB SEW WSH FIN REPLANNED · IN MINUTES PLAN GRID — FIVE PROCESSES · CONFLICT RESOLVED BEFORE PRODUCTION

PLATE 02 — PLANI8, THE CONNECTED PLAN · ILLUSTRATIVE

PROCEDURE — ERP ORDER TO LIVE FIVE-PROCESS PLAN, UNDER ONE HOUR

  1. 01PO loaded from ERP
  2. 02T&A assigned
  3. 03Capacity blocked
  4. 04MRP check for available stock
  5. 05Pre-production gate assigned — hard, system-enforced
  6. 06Embellishment capacity validated
  7. 07PSD assigned
  8. 08Delivery commitment check

143

LINES PLANNED THIS WEEK · 4 PLANTS

12 hrs

AVG REPLAN CYCLE — DOWN FROM 4 DAYS

+11%

ON-TIME LOADING VS LAST QUARTER

INSTRUMENT 02 · MODULE

Tracki8

Execution Control

Counting apps tell you what happened at shift end. Tracki8 tells you what’s happening right now.

Real-time shopfloor signal from every operation, style and process (RFID, barcode, or hardware-free QR and manual input), cross-referenced to plan as it lands. When output deviates, the right person is alerted within minutes with a corrective path, not a report the next morning.

READS — PER-OPERATION OUTPUT · ACTUAL VS TARGET, LIVE
MODES — RFID · BARCODE · QR / MANUAL (ZERO HARDWARE)

TARGET 09:41 — LINE 14 BELOW TARGET 09:45 — REBALANCED · RECOVERED OUTPUT BY OPERATION — LIVE SIGNAL, NOT SHIFT-END COUNT

PLATE 03 — TRACKI8, THE LIVE SIGNAL · ILLUSTRATIVE

SPECIMEN — ORDER B1204, 12,400 PCS · WIP RECONCILED BY SIZE ACROSS EIGHT STAGES · 29% PACKED
STAGESMLXLXXL
Cutting3050604020
Embellishment12021023015090
Preparatory180310350230130
Sewing line360620700460260
Washing270470520340200
Finishing220390440290170
AQL140240260170100
Packing — done4809101,040720430
LIVE RECONCILIATION — A PLANNER SEES WHERE THE ORDER SITS BEFORE THE BUYER ASKS

< 4 min

DEVIATION DETECTED TO REPLAN TRIGGERED

100%

OF OUTPUT CROSS-REFERENCED TO PLAN, LIVE

5

PROCESSES OBSERVED — NOT SEWING ALONE

INSTRUMENT 03 · MODULE

Maintaini8

Reliability Control

Machine health mapped to delivery risk — which orders are affected, how many days are at risk, and the window that protects them.

A maintenance log tells you a machine broke. Maintaini8 tells you which styles it would have sewn, how many days of delivery are exposed, and the exact maintenance window that protects the production end date, closing the loop from machine health to on-time delivery automatically.

READS — MACHINE HEALTH · ORDERS AT RISK · DAYS EXPOSED
ACTS — MAINTENANCE WINDOW SCHEDULED BEFORE FAILURE

FAILURE THRESHOLD MAINT. WINDOW RISK ZONE 3 STYLES HEALTH — M-3117, LINE 14 SERVICED INSIDE THE WINDOW — THE DASHED PATH NEVER HAPPENS

PLATE 04 — MAINTAINI8, HEALTH TO DELIVERY RISK · ILLUSTRATIVE

TURNAROUND — MACHINE EVENT TO ACTION WITH THE RIGHT STAKEHOLDER

1 day

INDUSTRY STANDARD — THE EOD REPORT

< 5 min

MAINTAINI8 — ISSUE, CONTEXT AND OWNER

INSIDE THE FIVE MINUTES — 01 ISSUE + CONTEXT RAISED  →  02 DRAFT CORRECTIVE ACTION PLAN  →  03 ESCALATION MATRIX, L1 → L3

26 min

NPT PER SHIFT — DOWN FROM 41

14.2 hrs

MTBF, MACHINE CLASS — +18% QTR

12 min

MTTR PER INCIDENT — −32% QTR

INSTRUMENT 04 · MODULE

Skilli8

Workforce Control

Your best supervisor carries the skills matrix in their head. Skilli8 captures it automatically.

Live skills intelligence at every station: each operator’s SMV achievement and efficiency grade per operation, captured through purpose-built station displays and wearable ID. When a key operator is absent, the coverage answer is already on the sheet: graded, current and specific to the operation.

READS — SMV ACHIEVEMENT · EFFICIENCY GRADE PER OPERATION
HW — STATION DISPLAYS + WEARABLE OPERATOR ID

SKILLS MATRIX — LINE 14 COVER: OP. 27 · GRADE A ON OP-16 OPERATORS × OPERATIONS — FILL = EFFICIENCY GRADE · VACANT STATION COVERED

PLATE 05 — SKILLI8, THE LIVE SKILLS MATRIX · ILLUSTRATIVE

THE GRADE SCALE — MEASURED AT THE STATION, NOT SELF-REPORTED · AUTO-UPDATED EVERY SHIFT

  1. AAbove 95% SMV achievement on the operation
  2. B80–95% — cover-ready, close to grade-up
  3. C65–80% — cross-training candidate
  4. DBelow 65% — training plan attached

TWO COMPONENTS — 01 THE PLATFORM: MATRIX, ABSENCE COVER, SEASON-CHANGEOVER GAPS  →  02 THE STATION: DISPLAY AT EVERY SEWING POSITION + WEARABLE ID, NO DATA ENTRY

+15 pt

LINE EFFICIENCY IMPROVEMENT, AVG

< 5 min

SKILL GAP DETECTED TO ACTION RECOMMENDED

100%

GRADES FROM LIVE DATA — NOT SELF-REPORT


IV.

Three corrections, observed

Across planning, quality and workforce, the instruments detect the early signal, recommend the right move, and close the loop before the situation reaches the leadership desk. Three corrections follow, transcribed from live production. Not roadmap. Not pilot.

OBSERVATION 01 · PLANI8 — PLANNING

Fabric delayed two days. PCD held.

The mill flags a 2-day delay on fabric in-house. Plani8 checks live cutting-room capacity, splits the order across two cutting tables to absorb the delay, and re-sequences a lower-priority order to free the second table. Sewing starts on the original PCD. The buyer’s ETA never moves.

22 SECONDS, END TO END · ETA 19 JUN PROTECTED

ACTION LOG — ORDER B1204 · 12,400 PCS · TUE 14:38
14:38:02Fabric mill flagged 2-day in-house delay — logged
14:38:11Plani8 split cutting across CT-01 + CT-02 · PCD held — cascaded
14:38:17Plani8 re-sequenced ORD-B205 · earlier-ETA order prioritised — approved
14:38:22Sewing starts on PCD · buyer ETA 19 Jun held — protected

OBSERVATION 02 · TRACKI8 — QUALITY

Defects piling at Op 5. Corrected at the source.

Tracki8’s line-scoring engine flags an unusual defect cluster at operation 5. The quality manager is alerted, and a parallel machine-issue ticket is auto-routed to the on-floor mechanic. The deviation closes before the next bundle finishes the line.

3 MINUTES 42 SECONDS · DEFECT RATE NORMALISED

ACTION LOG — LINE 04 · OPERATION FLOW · TUE 11:14
11:14:06Defect cluster flagged at Op 5, sleeve attach · 8.4% on last 120 pcs — flagged
11:14:40Quality manager notified, with context — routed
11:15:12Machine ticket auto-routed to floor mechanic · ETA 4 min — dispatched
11:17:48Defect rate normalised before the next bundle cleared the line — closed

OBSERVATION 03 · SKILLI8 — WORKFORCE

Operator output dropped 24%. Line rebalanced inside the shift.

Skilli8 sees a sustained efficiency dip on a specific operator before the line’s hourly tally even closes. It surfaces the skill gap, recommends pairing with a senior operator on the parallel station, and tracks the recovery. Output is back on target in the same shift.

28 MINUTES TO RECOVERY · SAME SHIFT

ACTION LOG — LINE 02 · OPERATOR EFFICIENCY · TUE 15:22
15:22:10Sustained efficiency dip at Op 05 · 76% against target — detected
15:23:05Skill gap surfaced · pocket-attach SMV variance — diagnosed
15:24:30Re-pair recommended with senior operator, parallel station · confidence 0.84, from 92 prior pairings on this style — recommended
15:50:00Output back on target · training tag added to operator profile — recovered

V.

The intelligence above the instruments

When the four instruments work together, the factory develops operational self-awareness: cross-process risk detected, decisions triggered, something learned from every production cycle. One operational brain, read by every role — a planner, a quality lead, a reliability engineer and a CXO see the same record, the same shift. And that clean, connected record is the foundation the factory’s AI runs on: ask it a question in plain language, and it answers from the instruments’ own records, with citations.

PLATE 06 — TRANSCRIPT OF AN INTERROGATION AI BOT · NATURAL-LANGUAGE FACTORY INTELLIGENCE · IN BUILD

Plate 06. The factory, interrogated in plain language — answers assembled from the instruments’ own records and cited to them. AI Bot is in build; conversational AI interfaces are already deployed in live factory environments. Illustrative transcript.

FIG. 04 — THE ORDER’S LIFECYCLE · 73% OF ORDER TIME IS NON-PRODUCING
73% NON-PRODUCING — WHERE THE PRO INSTRUMENTS ATTACK MFG · 23% — BASE FACTORY OS COSTING4–5 DAYS PO CONFIRM2–3 DAYS PROCUREMENT3–4 DAYS MACHINE PLAN2–3 DAYS MATERIAL IN-HOUSE45–50 DAYS MANUFACTURING PLANI8 · TRACKI8 · MAINTAINI8 · SKILLI8 ENGINEERI8 TECHPACK → BILL OF LABOR IN MINUTES, NOT 4–5 DAYS PLANI8 PRO COMMITMENT VALIDATED, CAPACITY BLOCKED IN MINUTES · NEXT MONTH’S MACHINE REQUIREMENT FORECAST IN DAYS THE BASE STUDY RUNS THE 23% — THE PRO INSTRUMENTS COMPRESS THE 73% AROUND IT
REGISTER OF PRO INSTRUMENTS — THE UPPER TIER · STANDALONE, OPT-IN, NO RIP-AND-REPLACE
INSTRUMENTROLEKEY READINGSTATUS
Plani8 Pro Secondary capacity — linked plans across cutting, embellishment, washing and sewing; reschedule sewing and the secondaries auto-cascade. Machine forecast surfaces capacity gaps 7 weeks ahead of season commit. LOADING PLAN 4–5 HRS → UNDER 1 LIVE · AGENT IN BETA
Engineeri8 Bill of Labor automation — techpack to MTM2-based SAM, confidence-scored, operation by operation. TECHPACK → BoL IN MINUTES IN BUILD
AI Bot Natural-language factory intelligence — ask the factory in plain language; answers assembled across the instruments’ records, cited. CITED ANSWERS IN SECONDS IN BUILD
BUILT FOR GROUPS THAT RAN A CUSTOM MES OR IN-HOUSE PLANNER AND HIT ITS CEILING — EACH INSTRUMENT ATTACKS A STAGE OF THE 73%

VI.

The apparatus runs above your stack

Factory OS is not a replacement system for your enterprise stack. It is a decision layer that runs above it: event-driven, API-first, no data duplication. Your ERP, SCADA and shopfloor systems keep running as they always have. The only things retired are the siloed point tools that never quite connected: MES, standalone planning, QMS.

FIG. 05 — THE APPARATUS IN SECTION
SPECIFICATION OF THE APPARATUS
DEPLOYMENT12 weeks to full operation. Weeks 1–4: integration, configuration, factory mapping. Weeks 5–8: live shopfloor data and team training. Weeks 9–12: full command layer, dashboards and calibrated decision triggers — run by a factory-native implementation team, on-site.
MODELSaaS platform + purpose-built hardware. Station displays and wearable operator ID where the module needs them; the platform reaches the floor through browsers and mobile devices.
ARCHITECTUREEvent-driven and API-first. Factory OS ingests signals from the systems below it, unifies them and applies intelligence — without duplicating their data or interrupting their operation.
INTEGRATIONSProduction-ready catalog. SAP ECC & S/4HANA, Oracle NetSuite, Epicor, Infor on the ERP side; MES and SCADA over OPC-UA and MQTT; shopfloor PLCs, sensors, vision systems and IoT gateways.
SCALEBuilt for groups, not single plants. From 1 factory to 50: multi-site, multi-country, multi-currency, one source of truth all the way back to HQ — and configurable from a 500-worker factory to a 10,000-worker group without custom development.
SECURITYAccess controlled to the asset level. Role-based permissions by plant, line and machine; data encrypted in transit; audit-ready API integrations. Your operational data stays yours.
SOVEREIGNTYData-residency controls and air-gapped-capable options for sovereign and secure manufacturing environments.

VII.

Field sites — the study is already running

This is not a proposal document. The study is live in 140+ factories across 8 countries, in some of the largest apparel groups in the world, observed daily by more than 6,000 floor users.

REGISTER OF FIELD SITES — APPAREL GROUPS RUNNING LIVE
SITECOUNTRIES OBSERVED
YoungoneBANGLADESH · VIETNAM
MASSRI LANKA
ArvindINDIA
AnantaBANGLADESH
ConcordSRI LANKA
Global IndoINDONESIA
PT Sai ApparelINDONESIA
ViyellatexBANGLADESH
Urmi GroupBANGLADESH
KyungseungINDONESIA
Premier KnitsINDIA
… AND OTHER APPAREL GROUPS ACROSS INDIA · BANGLADESH · SRI LANKA · INDONESIA · VIETNAM — 8 COUNTRIES RUNNING LIVE

81%

GROUP OTL — OBSERVED TODAY

97%

GROUP RFT — OBSERVED TODAY

38 4 min

EVENT-TO-ACTION, BEFORE → AFTER

Counting apps tell you what happened at shift end. Factory OS tells you what to do next.

— THE PREMISE OF THE STUDY

“Operational excellence, amplified.”

Within a year, Solvei8 has supercharged our operations: accelerating throughput, lifting quality, skyrocketing RFT. We’re not just hitting targets, we’re exceeding them with precision.

REHAN IDRESEE · MOHAMMADI GROUP (BANGLADESH)

“Real-time operations, end to end.”

Quality, production and work-in-progress are now mapped live across every shift. Responsibility and accountability have stepped up across the floor.

MAASHED ABDULLAH · DRESSMEN GROUP (BANGLADESH)

“A new ‘Right First Time’ benchmark.”

Solvei8 transformed our operational efficiency with seamless tracking and the kind of insight we’d been missing. It sets a new benchmark for excellence.

JW KIM · APPARELTECH (KOREA)

OBSERVER’S NOTE
FIELD SITE: PREMIER KNITS, INDIA

“A robust production system requires both visibility and control. Solvei8’s deep, end-to-end solution, combined with its ease of use and strong implementation support, made it the right choice for us. Tracki8 has already helped us track production seamlessly, and we look forward to leveraging Plani8’s planning workflows to drive efficiency. Additionally, Solvei8’s affordability ensures that technology-driven manufacturing excellence remains accessible and scalable for us.”

M. SHANMUGAM · MANAGING DIRECTOR, PREMIER KNITS (INDIA)

VIII.

The worksheet — margin at stake

Enter the factory’s own observed values. The worksheet computes the annual margin Factory OS targets across throughput, quality and expediting, at conservative benchmark gains from live deployments — an estimate to pressure-test, not a quote.

ENTRIES — YOUR FACTORY, AS OBSERVED

BENCHMARK GAINS APPLIED — EFFICIENCY +5 POINTS · REWORK −25% · EXPEDITING −0.4% OF ORDER VALUE. ILLUSTRATIVE ESTIMATE FROM YOUR ENTRIES, NOT A QUOTE.

COMPUTED — ANNUAL MARGIN AT STAKE
$742KTOTAL, PER YEAR — ACROSS THE THREE LINES BELOW
$461KTHROUGHPUT GAIN — EFFICIENCY +5 POINTS
$97KQUALITY — REWORK DOWN 25%
$184KEXPEDITE AVOIDANCE — 0.4% OF ORDER VALUE
960K pcsEXTRA SELLABLE OUTPUT / YR
101K pcsREWORK UNITS AVOIDED / YR

Q&A

Questions raised in the field

Nineteen questions factory leadership, IT evaluators and owners ask before they begin, answered the way the study answers everything: specifically.

Q.01What is Factory OS?

Factory OS is the real-time operational control layer for apparel manufacturing, built by Solvei8. It unifies planning, production, quality, maintenance and operator tracking in one system that runs above a factory’s existing ERP and shopfloor software — ingesting their signals, applying intelligence, and turning them into decisions and actions while orders are still on the floor.

Q.02What is Solvei8?

Solvei8 is the company behind Factory OS. Its people come from factory floors rather than software offices, and its platform is live in more than 140 apparel factories across eight countries — tracking 27 million garments a month, with over 6,000 floor users working in it daily.

Q.03Who is Factory OS built for?

Export-oriented apparel, footwear and textile manufacturers supplying international brands. The evaluation is typically led by a COO, VP of Operations or factory director, with group leadership as final sign-off. It fits mid-to-large factories and multi-unit groups running many lines across several processes.

Q.04Does Factory OS replace our ERP?

No. Factory OS runs above your ERP, SCADA and shopfloor systems — SAP, Oracle NetSuite, Epicor, Infor and others keep running exactly as they do today. It is event-driven and API-first, reads their signals without duplicating data, and does not disrupt the systems already governing your factory.

Q.05What does Factory OS replace?

The siloed point tools: MES, standalone planning software and QMS. Each solves one problem in isolation; Factory OS replaces them with a single decision layer covering all five processes, so production, quality, planning and maintenance stop working from different versions of the truth.

Q.06What does Plani8 do?

Plani8 is planning control: the only production plan covering all five garment processes — cutting, embellishment and embroidery, sewing, washing, finishing — in one connected plan. It detects cross-process capacity conflicts before they reach production and re-plans in minutes when the floor changes, where legacy tools take days.

Q.07What does Tracki8 do?

Tracki8 is execution control: real-time shopfloor signal from every operation, style and process, cross-referenced to plan. When output deviates, the right person is alerted within minutes with a corrective path — instead of a tally sheet at shift end. It runs on RFID, barcode, or hardware-free QR and manual input.

Q.08What does Maintaini8 do?

Maintaini8 is reliability control: machine health mapped to delivery risk. It keeps the machine registry and service history, anticipates failures on sewing, cutting and embellishment machines, and shows which orders and styles are affected, how many days are at risk, and the exact maintenance window that protects delivery.

Q.09What does Skilli8 do?

Skilli8 is workforce control: live skills intelligence for every station. It captures each operator’s SMV achievement and efficiency grade per operation automatically — through station displays and wearable ID — and shows who can cover when a key operator is absent, replacing the skills matrix your best supervisor keeps in their head.

Q.10Which processes does Factory OS cover?

All five: cutting, embellishment and embroidery, sewing, washing and finishing — in one connected plan that auto-adjusts to floor changes. Competing planning and tracking tools cover sewing only, which is why deviations upstream or downstream surprise them. Factory OS traces the whole order journey, from PO confirmation to packing.

Q.11How does Factory OS integrate with our systems?

Through a production-ready integration catalog: SAP ECC and S/4HANA, Oracle NetSuite, Epicor and Infor on the ERP side; MES and SCADA over OPC-UA and MQTT; and shopfloor hardware including PLCs, sensors, vision systems and IoT gateways. Integration is API-first and event-driven, with no data duplication.

Q.12How long does deployment take?

Twelve weeks to full operation. Weeks one to four establish integrations, configuration and factory mapping; weeks five to eight bring live shopfloor data and team training; weeks nine to twelve activate the full command layer with management dashboards. A factory-native implementation team runs the deployment on-site.

Q.13Can Factory OS run in sovereign or secure environments?

Yes. Factory OS offers data-residency controls so operational data stays in the region you choose, and air-gapped-capable deployment options for secure manufacturing environments. The platform combines SaaS with purpose-built hardware and can be configured to the compliance posture your group requires.

Q.14Is Factory OS the foundation for factory AI?

Yes — Factory OS is the foundation a factory’s AI runs on. The clean, connected, real-time data it captures across planning, production, machines and operators is what AI needs; and when the four modules work together, the factory detects cross-process risk, triggers decisions, and learns from every production cycle.

Q.15How does Factory OS compare with Infor or Bluecherry?

Infor is broad enterprise ERP; Bluecherry is oriented to brands and importers for supply-chain and order management. Factory OS is purpose-built for the factory floor itself — real-time execution, five-process planning, machine reliability and workforce skills — and runs above ERP rather than competing with it.

Q.16Does Factory OS work with Lectra?

Yes — they are complementary. Lectra specialises in cutting-room automation, CAD/CAM and fabric optimisation; Factory OS controls everything from cutting output onward: embellishment, sewing, washing, finishing, planning, maintenance and workforce. Cutting-room systems hand off orders to Factory OS through its integration layer.

Q.17What AI is live on the factory floor today?

Solvei8 is deploying conversational AI interfaces in live factory environments. Instead of navigating dashboards, a floor manager can ask in natural language which lines are behind target right now, or what the breakdown history is on a line’s machines this month, and get an immediate answer grounded in that factory’s own operational data — with the records cited.

Q.18What are the Pro products?

Three standalone specialists for mature operations: Plani8 Pro — secondary capacity with an auto-loading agent that cuts loading plans from 4–5 hours to under one; Engineeri8 — techpack to Bill of Labor in minutes, MTM2-based and confidence-scored, in build; and AI Bot — natural-language factory intelligence with cited answers, in build. Opt-in, modular, no rip-and-replace.

Q.19What is the implementation success rate?

Solvei8 reports a 100% implementation success rate across deployments: no customer has gone live and failed to adopt the platform. Deployments are run by an in-house, factory-native consulting team — not external integrators — with structured post-go-live usage audits that verify the system is used correctly and delivering value.


IX.

Begin your study

The five lanes recombine where every study ends: at delivery. File the intake sheet and a Solvei8 consultant — someone who has run a factory floor — will conduct the first observation with you.

FIG. 06 — THE LANES RECOMBINE AT DELIVERY
INTAKE SHEET — REQUEST A DEMONSTRATION FORM REF. FOS-001
STEP 1 OF 3 — THE OBSERVER

Enter your name so the consultant knows who to address.

Enter a valid work email — the demonstration invite goes here.

Select the role closest to yours.

STEP 2 OF 3 — THE FACTORY

Enter the manufacturing company or group name.

Select your factory count.

Select the region where your factories run.

STEP 3 OF 3 — FILE THE SHEET